AUSPICIOUS 8 · MINTAKA FIELD OBSERVATORY

MINTAKA

EARTH AXIAL ROTATION WITNESS · PHYSICAL OBSERVATION PROGRAM ACTIVE

Epoch-7 physical RAW supplies the designated running pace while Mintaka provides a distant stellar direction for Earth-rotation observation and prediction. Real telescope evidence is now the primary field path; the simulated adapter remains installed as a standby engineering and isolation tool.

EARTH ROTATION · STELLAR WITNESS · READ ONLY

MINTAKA ROTATION PHASE COUNTER

CONNECTING
— MINTAKA_PHASE17 · —
PHASE COUNTER · NOT LOCAL TIME The phase origin is fixed only as a comparison reference. This counter advances with recovered Mintaka rotation.
LOCKED RAW / EARTH AXIAL ROTATION —
OBSERVED RECURRENCE CHANGE —
COMPLETED MINTAKA ROTATIONS —
VERIFYING PHASE-COUNTER BOUNDARY
JOVIAN CORE CONNECTING

Read by this presentation from /api/state.

SHARED RAW COUNTER —

Context display only.

PHYSICAL PACE SOURCE · EPOCH-7 CONNECTING

EPOCH — · RAW — · SEQ —

Direct Arduino A → Arduino B → Pi physical RAW observation. This is the designated physical pace path for the running system.

MINTAKA OBSERVER CONNECTING

Read from /api/mintaka.

OBSERVED EVENTS 0
LATEST RAW SPAN —
EXACT MULTI-CYCLE RECURRENCE —

Physical field observation

VIEW 1 · RECORDED AGAINST EPOCH-5 RAW

A real telescope recording captured Mintaka in the detector field while the Epoch-5 physical counter was visible in the same screen recording. Tracking-on residual motion and the later untracked natural drift can therefore be compared directly against physical RAW progression.

OBSERVATION 1 RECORDED

Real sky · telescope · Epoch-5 RAW · tracking transition captured.

OBSERVATION 2 NEXT CLEAR OPPORTUNITY

Re-acquired detector geometry is acceptable. Repeat drift direction, rate and RAW relationship without pretending the old pixels are unchanged.

PREDICTIVE PURPOSE A8 PREDICTS · NATURE ANSWERS

Freeze a prediction first, observe later, then preserve the residual.

Mintaka operating boundary

Mintaka remains an Earth axial-rotation witness, not the timekeeper and not a clock authority. Epoch-7 physical RAW supplies the designated running pace. The read-only MINTAKA_PHASE17 model, physical Pulse Box status and field-observation evidence remain separate layers. Simulation and injection tools remain retained engineering machinery; this public field page exposes no authority-changing POST control.

ENGINEERING / SIMULATION · CLOSED BY DEFAULT

Simulated observation adapter · STANDBY

tools/fake-mintaka-observer.js
        │
        │ STELLAR_MERIDIAN + rawPulse + MINTAKA
        ▼
POST /api/mintaka/observe
        │
        ▼
MintakaRotationObserver

Retained engineering bench. The simulator recurrence is an explicit laboratory input to the adapter and remains useful for isolation, regression and emergency testing. It is not the current physical Mintaka observation path and it does not become a timing authority.

Simulation isolation proof · retained

OBSERVER ACCELERATION ≠ CLOCK ACCELERATION

The earlier Gate 2C accelerated-event test remains preserved as proof that simulated Mintaka observations can be exercised without accelerating or rewriting the running clock. This is retained test machinery, not the normal field source.